After many years passionate restoration, and several more when little has happened, I think it is finally time to sell the project. Someone else will have to finish it.
Saturday, 26 April 2008
adjusted radiator stand
Monday, 21 April 2008
Radiator's done!
As you can see, it looks great. Now that it is assembled, it is fractionally too tight for the stand which I made, but some simple modification should take care of it. I have done some measurements, and apparently the bending of the steel caused some loss of distance across the span....amounting to about 4mm in the worst places, so I have just removed a section of the near-side upright and bent an insert to weld in place some millimetres over. It should be fine. I shall finish that tomorrow evening.
Thanks Andy.
.
Sunday, 13 April 2008
"B" channel reproduction with quarterlight surround
Tuesday, 8 April 2008
Spend! Spend! Spend!
I talked to Mark at Sheldrake and Wells yesterday and he showed me a slighly different core, which will be about 30% more efficient than the original. I will do a piece on this specially, but essentially, they remove the top and bottom, clean them out and solder in a brand new core, fit the sides, then paint the entire job. Mark has taken a couple of before shots and will take one in the process of being transformed. I shall let you all have details of the core later.
After work today I rushed over to NTG as they have very kindly agreed to let me send my leafsprings to Jones Ltd using their courier account, which ought to save me some cash - cheaper than Parcelforce etc. It also gives me greater confidence because NTG have a relationship with Jones, who are very highly recommended by them. NTG have done it on account, which is very decent of them.
When these bits are back, I will be making very real progress. By then the axles will be ready to go back on. Am still waiting to hear back from a friend about the size of shocks needed; anyone know?
Friday, 4 April 2008
Progress - The wisdom of a friend
Not sure if Sheldrake and Wells are open on Saturdays, but if not I shall take the rad into them on Monday afternoon, after school, to be recored.
Saturday morning update. Went to Sheldrake and Wells. Just caught them as they were locking up. The boss wasn't there. Left rad and sides. Talked to chap there who said that they will measure it up and order the core from somewhere else which has a 24 hr turnaround. They then do all the soldering on site. I shall not be working Monday afternoon, so I shall go in to see the boss. Apparently, you can choose a variety of cores, some of which give more efficient cooling....I think he called it SP2, which sounds just the job. Forgot to get a receipt, but never mind. Hoping to arrange to do some photographing; shame I didn't get this far this week. Working next week means not being able to see mine actually worked on, I reckon.
Time-consuming metalwork
Tuesday, 1 April 2008
Carbs and Leafsprings
I also talked to Chris from Brost Forge today about quoting me for leafsprings, which he anticipates being able to do for about £120 per spring, but as he is not online, I have sent him drawings from the manual and a copy of this page showing the dimensions and the Jones Ltd quote, as he may be able to better it.
God, the metalwork seems interminable!
Today, as well as working on the radiator sides, which need loads of adjusting, I trimmed away some rusty sections of windscreen surround and formed and inserted some virgin steel, having removed surface rust from the inner surround. I think I shall MIG drill-spot weld the strip in place. It is larger than what can be seen here. Welding a tab, cut for the purpose, inside will lever it into place....but a tricky bit of welding may be needed along the fringe of fillet....though I am reluctant to do this partly because the material is likely to blow through and secondly because grinding it back afterwards will be tricky in a concave.
I shall then treat the rusty fillet and squeeze POR15 paste into the fillet to cure and strengthen it.