Thank you all for your interest and kind offers; have never before been offered desirable sports cars as swaps! Discretion dictates that I give no details of the sale. But what I will say is that both the seller and buyer are delighted, and I am especially pleased to be able to report that the 101 is staying "in the family", so to speak; it is not going to some opportunistic dealer, but to a real enthusiast. And so gratifying that he had read this blog from start to finish and so appreciated what I have put into the project.
Saying goodbye to 3591 NG will be a wrench after all these years, but it will be good knowing that someone is going to finish her properly.
Thursday, 19 June 2014
Wednesday, 11 June 2014
A summary of work done
The project has involved the repair of much of the scuttle and replacement of lots of panels. Please click on the following links:
"A" pillar ; inner arches ; inner wing ; panel interior ; dash panel with captive nuts ; outriggers ; radiator frame: radiator sides,dash repair; rad blanking plate; cab floor support ; quarterlight sill
"A" pillar ; inner arches ; inner wing ; panel interior ; dash panel with captive nuts ; outriggers ; radiator frame: radiator sides,dash repair; rad blanking plate; cab floor support ; quarterlight sill
Clutch replaced
Running chassis 98% complete
with newly forged leafsprings front and back and brakes re-lined, hydraulics replaced
radiator re-cored and mounted in a rad stand I fabricated myself
Parts and panels bought and third party work carried out
.
Tuesday, 10 June 2014
Breakdown of expenditure for those considering buying my project
The following is my verifiable outlay so far (in terms of parts and third party labour)
Initial purchase price 551.00
McKenzie inner arches approx 30.00
McKenzie front valance 58.00
McKenzie front valance top panel 14.00
engine work by third party 90.00
re-core radiator 217.38
newly forged leafsprings all round 634.50
bush shackle 9.40
wheels shot blasted and re-painted (900 two-pack)by third party 100.00
fitting tyres to wheels 50.00
petrol tank repaired 60.00
POR15 25.00
starter motor 59.00
hydraulic pipe kit (made to measure) 104.12
rear shocks 44.99
engine mountings 11.48
12.59
side lamps 82.00
front shocks 47.52
classic tyres 497.10
king pin set 44.00
pull off springs 42.65
brake shoe re-lining 88.00
wheel bearings 24.45
front wheel cylinders (MG TD/TF) 99.35
two mater cylinders 105.00
misc bushes from NTG 9.40
Grand Total £3,110.93
PLUS
other expenditure for which I can't find the receipts:
clutch plate, clutch cover and thrust bearing,
ex-stock, brand new and primed Austin 101 front panel
handbrake cable
track rod ends
etc
PLUS
other expenditure for which I can't find the receipts:
clutch plate, clutch cover and thrust bearing,
ex-stock, brand new and primed Austin 101 front panel
handbrake cable
track rod ends
etc
Any price finally agreed upon would have to cover at least the outlay so far on parts. I do not know how to quantify the work done to get the van to the stage it is at now. Have a look at how far I have come, by looking back through the blog. What we have now is a rolling chassis with engine (run on test bed but needs finished carb and exhaust), gearbox, prop shaft, breaks (hydraulics to be completed), wheels, tyres, shocks and leafsprings. To go on to it we have a front scuttle on which I have done lots of work, but which is not yet finished. Also have lots of metalwork done on inner arches, steps etc.
I also have lots of other parts: doors, wings, inner wings, sliding door runners, cab back, floor supports, floor panels, headlamps (originals and replacements), etc
I also have lots of other parts: doors, wings, inner wings, sliding door runners, cab back, floor supports, floor panels, headlamps (originals and replacements), etc
Saturday, 7 June 2014
Selling the project
Well folks, I think I have finally given up. I have bought another plane, started another metal project, set up self-employed and ...well, the list goes on. But the long and short of it is that I have run out of steam for my Austin 101 and need the garage and mental space.
Readers who have followed the project in the past will know how much work I have done on it over the years. Loads of metalwork. The engine now runs and is mounted back on the chassis in front of the gearbox and shaft on fresh rubber mounts.
It has new brakes, new hydraulic piping, new slave and master cylinders, a thousand pound's worth of 5 brand new classic tyres. Newly forged leaf springs all round and freshly mounted new shock absorbers. The scuttle is nearly ready to be mounted on the front of the chassis around a newly re-cored radiator, sitting on a newly fabricated frame.
I shall be working my way through the receipts to try to work out just how much I have spent on parts over the years, and other than recouping the initial outlay, I only expect to recover the cost of parts and re-fabricated parts.
Nothing will compensate for the thousands of hours spent on the project, but that never matters. Nobody does it for the money. It is all about the pleasure of the challenge. Someone keen could finish the project in about 6 months...,and I don't think I want to know about it when they do, because it is too frustratingly close to completion and I don't need my nose rubbed in it.
But I just know that I don't have the motivation, now, to finish it...and more importantly, I have other things making demands on my time.
So, get in touch if you are interested. If I don't sell privately in the next couple of weeks or so, I think I shall put it on ebay.
Read back through the blog to see what you'd be getting for your money.
Readers who have followed the project in the past will know how much work I have done on it over the years. Loads of metalwork. The engine now runs and is mounted back on the chassis in front of the gearbox and shaft on fresh rubber mounts.
It has new brakes, new hydraulic piping, new slave and master cylinders, a thousand pound's worth of 5 brand new classic tyres. Newly forged leaf springs all round and freshly mounted new shock absorbers. The scuttle is nearly ready to be mounted on the front of the chassis around a newly re-cored radiator, sitting on a newly fabricated frame.
I shall be working my way through the receipts to try to work out just how much I have spent on parts over the years, and other than recouping the initial outlay, I only expect to recover the cost of parts and re-fabricated parts.
Nothing will compensate for the thousands of hours spent on the project, but that never matters. Nobody does it for the money. It is all about the pleasure of the challenge. Someone keen could finish the project in about 6 months...,and I don't think I want to know about it when they do, because it is too frustratingly close to completion and I don't need my nose rubbed in it.
But I just know that I don't have the motivation, now, to finish it...and more importantly, I have other things making demands on my time.
So, get in touch if you are interested. If I don't sell privately in the next couple of weeks or so, I think I shall put it on ebay.
Read back through the blog to see what you'd be getting for your money.
Wednesday, 6 November 2013
Tuesday, 5 November 2013
Back from the dead
So, in the year I hit 50 (still young!), I was hit by depression, work related stress and then was hospitalised with pulmonary embolisms in both lungs! Jeeezus!
Nearly dying is just about the best reason for not making progress on my Austin. But I am back from the dead, now, rattling with pills, and Martin and I have our mojos back.
A few days ago we fitted my new starter motor
Nearly dying is just about the best reason for not making progress on my Austin. But I am back from the dead, now, rattling with pills, and Martin and I have our mojos back.
A few days ago we fitted my new starter motor
Sunday, 10 March 2013
Subscribe to:
Posts (Atom)


